Can the kitchen layout change?+
It may, but structure, plumbing, gas, electrical, ventilation and circulation must be checked first.
What should I send?+
Send photos, approximate dimensions, appliance intentions, storage problems, suburb and any plans.
Are appliances automatically included?+
No. Supply, installation and service requirements should be confirmed as explicit scope items.
What affects a kitchen renovation quote?+
Cabinetry extent, benchtop and splashback selections, appliance requirements, services changes, demolition, access and adjoining finishes all shape the developed scope.
Can a smaller kitchen renovation keep the existing layout?+
A limited update can be considered when the retained cabinets, layout and service connections still suit the kitchen. If the concern is mainly worn fronts or fittings, distinguish that request from changing cabinet carcasses, benchtops or appliance positions; we first confirm which smaller scope is a service fit. Damage, poor storage or changed plumbing, electrical or ventilation needs may favour a wider renovation. Include the Melbourne suburb, retained items, product choices and access constraints before an appointment or supply is arranged.
How is a kitchen renovation timeline worked out?+
Timing depends on design decisions, selections, custom items, approvals if relevant, trade sequencing and access. It should be discussed after those inputs are clearer.